Back to Case Studies

Odor exhaust treatment

Municipal wastewater

Chongzuo Longzhou County WWTP — Case Study

Chongzuo Longzhou County WWTP

Integrated scrubbing, adsorption, and bio-tower odor control. Design ~26,000 m³/h; commissioned Aug 2023.

Installation photos

Chongzuo Longzhou County WWTP installation 2
Chongzuo Longzhou County WWTP installation 3

Request a comparable project reference

Detailed airflow, inlet conditions, equipment configuration, commissioning date and measured results are shared only after the corresponding project record and client-name permission have been checked.

Send your project conditions

Client name and category are based on the company project archive. This page intentionally omits unverified design and performance figures until the project file and publication permission are confirmed.