What information is required to size an industrial air treatment system?
Please provide design airflow, pollutant names and inlet concentrations, gas temperature and humidity, operating hours, dust or mist loading, required outlet limit, available footprint, electrical supply, and site location. Process safety data is also required for flammable or reactive streams.