Guigang WWTP (Guangxi) — Case Study

Guigang WWTP (Guangxi)

Fans, scrubber, carbon, and biological tower train. Design ~15,000 m³/h; commissioned Jun 2023.

Published project parameters checked

This municipal wastewater odor-control project uses a four-part train: extraction fan, wet scrubbing, activated-carbon polishing and biological treatment. The catalog records the design airflow and commissioning month; pollutant-specific inlet and outlet measurements are not published.

Published project data

Application
Municipal wastewater treatment plant odor control
Location
Qintang, Guigang, Guangxi, China
Design airflow
15,000 m³/h
Published equipment train
Fan + spray scrubber + activated-carbon box + biological tower
Commissioning record
June 2023
Published test concentrations
Not included in the source record

How the treatment train is configured

Engineering interpretation

Extraction fan

Maintains negative pressure at enclosed odor sources and moves the documented 15,000 m³/h design flow through the train.

Engineering interpretation

Spray scrubber

Provides front-end conditioning and absorption for water-soluble or chemically reactive odor components.

Engineering interpretation

Biological tower

Provides biological degradation for compounds that are biodegradable under controlled moisture, pH and nutrient conditions.

Engineering interpretation

Activated-carbon polishing

Provides a final adsorption barrier for residual peaks or compounds not fully removed upstream.

Design and repeat-project checks

  • The catalog confirms the airflow, equipment train and project month; it does not identify project-specific H₂S, NH₃ or odor-unit concentrations.
  • For a repeat project, headworks, sludge-handling and enclosed-space airflows should be calculated separately before selecting the common fan duty.
  • Carbon capacity and biofilter residence time must be checked against measured load, humidity, temperature and operating variability.

Evidence boundary

Airflow, configuration and commissioning month are taken from the company project catalog. Because no signed performance report is included, the page does not state a project removal percentage or measured outlet concentration.

Source records

Evidence reviewed 2026-09-20.

Continue your engineering review

Installation photos

Guigang WWTP (Guangxi) installation 2
Guigang WWTP (Guangxi) installation 3

Request a comparable project reference

Send your own airflow, pollutant, temperature and outlet requirements for a project-specific process review. Published reference values are not a substitute for sizing your system.