Back to Case Studies


Other engineering
Pilot / scale-up plant
Shenzhen Guangming New Materials Pilot & Industrialization Base — Case Study

Pilot-line capture and treatment for new material process trials.
Installation photos


Request a comparable project reference
Detailed airflow, inlet conditions, equipment configuration, commissioning date and measured results are shared only after the corresponding project record and client-name permission have been checked.
Send your project conditionsClient name and category are based on the company project archive. This page intentionally omits unverified design and performance figures until the project file and publication permission are confirmed.