Back to Case Studies

Odor exhaust treatment

Waste transfer / MSW

Shenzhen Longgang — Youhe Environment (Waste Transfer Station) — Case Study

Shenzhen Longgang — Youhe Environment (Waste Transfer Station)

Spray tower plus high-energy ion stage for transfer-station odor. Design ~45,000 m³/h; commissioned Dec 2022.

Installation photos

Shenzhen Longgang — Youhe Environment (Waste Transfer Station) installation 2
Shenzhen Longgang — Youhe Environment (Waste Transfer Station) installation 3

Request a comparable project reference

Detailed airflow, inlet conditions, equipment configuration, commissioning date and measured results are shared only after the corresponding project record and client-name permission have been checked.

Send your project conditions

Client name and category are based on the company project archive. This page intentionally omits unverified design and performance figures until the project file and publication permission are confirmed.