Back to Case Studies


Odor exhaust treatment
Waste transfer / MSW
Shenzhen Longgang — Youhe Environment (Waste Transfer Station) — Case Study

Spray tower plus high-energy ion stage for transfer-station odor. Design ~45,000 m³/h; commissioned Dec 2022.
Installation photos


Request a comparable project reference
Detailed airflow, inlet conditions, equipment configuration, commissioning date and measured results are shared only after the corresponding project record and client-name permission have been checked.
Send your project conditionsClient name and category are based on the company project archive. This page intentionally omits unverified design and performance figures until the project file and publication permission are confirmed.