Back to Case Studies

Odor exhaust treatment

Industrial park WWTP

Yangchun Industrial Transfer Park Biological WWTP — Case Study

Yangchun Industrial Transfer Park Biological WWTP

Biological deodorization and fan system for park WWTP. Design ~30,000 m³/h; commissioned Jul 2023.

Installation photos

Yangchun Industrial Transfer Park Biological WWTP installation 2
Yangchun Industrial Transfer Park Biological WWTP installation 3

Request a comparable project reference

Detailed airflow, inlet conditions, equipment configuration, commissioning date and measured results are shared only after the corresponding project record and client-name permission have been checked.

Send your project conditions

Client name and category are based on the company project archive. This page intentionally omits unverified design and performance figures until the project file and publication permission are confirmed.