Back to Case Studies


Odor exhaust treatment
Metal / water industry
Zhaoqing Shuiye Metal — Case Study

Fan, scrubber, carbon, and biological tower. Design ~15,000 m³/h; commissioned Jul 2021.
Installation photos


Request a comparable project reference
Detailed airflow, inlet conditions, equipment configuration, commissioning date and measured results are shared only after the corresponding project record and client-name permission have been checked.
Send your project conditionsClient name and category are based on the company project archive. This page intentionally omits unverified design and performance figures until the project file and publication permission are confirmed.