Back to Case Studies

Odor exhaust treatment

Metal / water industry

Zhaoqing Shuiye Metal — Case Study

Zhaoqing Shuiye Metal

Fan, scrubber, carbon, and biological tower. Design ~15,000 m³/h; commissioned Jul 2021.

Installation photos

Zhaoqing Shuiye Metal installation 2
Zhaoqing Shuiye Metal installation 3

Request a comparable project reference

Detailed airflow, inlet conditions, equipment configuration, commissioning date and measured results are shared only after the corresponding project record and client-name permission have been checked.

Send your project conditions

Client name and category are based on the company project archive. This page intentionally omits unverified design and performance figures until the project file and publication permission are confirmed.